One step forward two steps …..
One step forward two steps ….. well you all know how that
line goes and that’s how it feels sometimes. This is not the first time I’m
felt this way and in fairness it’s never actually anything but progress. Don’t
think they guys at the classic car center have put a foot wrong.
Suppose to explain in a bit more detail. When restoring,
repairing or just fixing something, there is always two ways to do it. Either
do the minimum or check whether the minimum is enough for what you want and if
not improve it. And improvement seems to be high on the list of ‘thing to do’.
Its these little improvements that really take time, each improvement being
bespoke and unique to this project. And being unique makes it worthwhile.
The roll cage being a point in case. It arrived and looked
the part, tested fitted ok. But when we all stood back and looked at it, we
thought the front roll bar was a bit ‘agricultural’ and didn’t fit to well.
There is no question is would have been fine, but it could be better. So it was
set aside and a new front roll bar made to suit the BJ. Again like most ‘let’s
improve it’ ideas, sounds simple enough, but the extent of the improvement is
what makes the difference.
So let’s look at the problem, the original roll bar sat away
from the dash, hampered the foot wells and didn’t align to well with the rake
of the windshield. So the solution was to make a new one which was wider and
aligned tight with the window corners and windshield. All simple enough, except
that to align with the windshield without putting tight radius in the roll bar
would mean notching each end of the dash to accommodate the uprights. So now
the roll bar fits really neat, tight to the window corners, windshield and
roof. Test fitted all looks well .. almost. Now it fits so good it hampers the
locking nuts for the drop down windshield, the sun visor and rear view mirror.
Just minor problems, but all minor problems require measuring, fitting, making
stuff and refitting ….
So now the simple front roll bar has become a roll bar,
anchor point for the windshield locking nuts, mount for sun visors and rear
view mirror.
So yes .. there are two ways to do things … appears we have
chosen the ‘improvement’ path where ever possible :)
…
A recap on 'improvements' to date.
Chassis/Running Gear
Straighten and strengthened chassis. Oh, in case the
question is asked, the chassis is being finished in paint. Many people galvanize the chassis and I had thought about it and discussed it with Alex
& Steward, my initial fears of the chassis bending while galvanised were
dismissed, however I was told that galvanizing the frame could make the joints
at the spring mounts brittle leading to failure. That was enough for me to
dismiss the galvanising route. Powder
coating was considered but ruled out on the basis that should the surface get
damaged there is the possibility of water seeking under neat the powder coat
finish leading to blistering etc.
So in the end we were happy soda blast the frame, repair and
strengthen where required, prim coat and apply a few coats of paint.
The rear cross member had to be split and welded to remove a bend
Front cross member plated and welded
The axles, diffs and brakes were rebuilt, ARB lockers added
front and rear. Thankfully the JDM BJ’s came with disk brakes up front, so they
just needed new pads and a bit of TLC. All look like they will last another 30
years.
New suspension and shocks all round, it’s a 4”lift, this
will probably be changed some time in the future to a 2.5” lift. The 4” lift
might look the part, but makes the whole thing a bit bouncy on the rood. Will
see if it settles a bit over time.
The engine as checked out before any work started and the
compression test done. It was given a clean bill of health so left as is with
the exception of all new gaskets, turbo and a tidy up. Gearbox and transmission was working fine, so
as nothing was broken, we didn’t touch them.
Power steering
Electric power steering is being installed rather than
hydraulic. Again we thought about this and while the hydraulic power steering
is fine, it requires additional pulley wheel, pump, hydraulic lines and
mounting brackets to both the frame and engine. We choose the electric steering
because of its simplicity and ease of installation. The units comes supplied
with a new steering column, motor , bracket and loom. The motor sits under the
dash and the whole assemble mates with the existing lower steering arm. Neat
and straight forward.
The body, well not much of the original left, what was kept
(roof, upper rear, front section, doors and bonnet ) was all repaired, patched,
primed . With the addition of the aluminium tub the whole body should be pretty
good.
Supplied by ezpowersteering
Hard Top/No Top
Always wanted to be able to take off the top, just in case,
we managed to get a day of sunshine. Again sounds simple but needs a whole heap
of things done to make it manageable. So taking it in sequence. First the full
doors should be easily removed. So a little thought for the hinge assemble. The
front door hinges were pretty easy, we just added a locking spud to the hinge
pin that way the doors can be lifted without removing the whole hinge assemble
and the half doors inserted. Second were the rear doors. The rear doors were
not so easy as the hinge assembly is different, just meant cutting a piece out
of the receiving hinge bracket, to allow the doors to he pulled rather than
lifted and insert the new rear tail gate. The perimeter of the rear tub (top
section) was fitted with rows of captive nuts. This should make removal of the
top that bit easier
The Dash
Have decided to pretty much replace all the original
switches, this was a pretty big decision, because they original pull switches
are pretty unique to the Land Cruiser. But given that there are new switches
and gauges to be added, we felt it was best to redone the whole look and layout
of the dash. Not for everyone, but no going back now …
New switches include the three ARB lockers and air
compressor, I wanted to have the ARB lockers and winch buttons to be powered from
a separate power switch remote from the main cluster. This was to prevent
accidental engagement of the lockers and we didn’t want that now … young kids
and buttons .. never a good combination.